$415m Townsville refinery plan stacks up

Positive scoping study results

$415m Townsville refinery plan stacks up

Queensland Pacific Metals has reported positive results from a  scoping study on a proposed $415 million battery materials refinery in Townsville.

The study looked into the feasibility of constructing a battery materials refinery that would process nickel-cobalt ore imported from New Caledonia.

It would produce battery-grade nickel and cobalt sulphate for use in the battery market as well as valuable co-products including hematite, alumina and magnesium oxide

The study was based on a throughput of 600,000 wet tonnes of ore per annum to produce about 25,400 tonnes per annum of nickel sulphate and 3000 tonnes of cobalt sulphate.

The estimated capital cost is estimated at US$297 million ($415 million), which includes a contingency of US$65 million.

Pure Minerals, which has secured an option to acquire QPM, announced the study results – saying it had confirmed the commercial potential of the project.

It said QPM would now proceed towards further feasibility studies, completing metallurgical testwork and obtaining the necessary regulatory approvals for the project to proceed.

http://new.fortisem.com.au/norths-new-take-on-nickel-processing/

 

PLEASE SHARE ON YOUR

LATEST NEWS

No Thumbnail

Tenders are sought for ex-Royal Australian Navy helicopters. The RAN is currently withdrawing it’s fleet of AS350BA Squirrel and is […]

READ MORE

The North Queensland Civil Construction Association has sought an undertaking from State Government that local contractors be given preference for […]

READ MORE

The mighty flow in the Flinders River this week has highlighted the potential power of a planned 400,000 megalitre dam […]

READ MORE